Close
(0) items
You have no items in your shopping cart.
All Categories
Preferences
Search

Hybrid Plug & Abandonment + Hydraulic Workover Unit

$0.00
With its modular designed and lighter load weight and footprint, Hybrid Plug & Abandonment Workover standalone unit mitigates the challenges that stem from limited space, excess well slot, pressure and remote, hard to reach locations.
Please select the address you want to ship to
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options

KEY FEATURES:

 

  • Year Built : 2010
  • Year Refurbish & Upgraded : 2021
  • 460,000 lbs pulling capacity
  • Intervention depth deep to 9,000 feet
  • Self-contained for easy both land and sea transport
  • Through bore up to 32 inches
  • Handles 2-3/8” to 30” D. pipe, casing and conductor
  • 5,000 to 22,000 ft-lb range of torque capabilities
  • Self-racking, skidding, pipe laydown/ handling and Quick Jack features
  • BOP pneumatic trolley system capable of sustain up to 44,000 lbs
  • Quick pipe working with pneumatic Tong trolley system
  • 6 Tons Swing able Gin Pole (2.3 Tons at Well center)

 

 

INNOVATION TECHNOLOGY

 

  • Quick stack tower allows for a safer and easier way to enter and exit the work basket
  • Rig convertible to be Hydraulic Work Over (HWU) operation with less equipment
  • Faster Rig up and Rig down with stackable unit
  • Guidewire not
  • Self-erecting swingable Gin pole from horizontally by hydraulic piston

 

  • Complete unit assembled and tested for customer acceptance
  • Construction complies with DNV 7.1, EN 12079, ABSC design calculations MODU, AISC, AWS
  • All lifting eyes to be load tested to a minimum of 5 times the eye’s rated safe working load.
  • The unit and BOP stack will be configured in a modular
  • There is no need for guy wires due to the modular
  • There is no need for outrigger arms due to the modular
  • The unit is run on environmentally friendly
  • Each module is connected by fast lock
  • The unit is sized such that it can pull ( i.e. 500,000k pull )
  • The platform cranes can rig this unit up without having to remove each piece of the
  • 320 Joint of 3 1/2” drill pipe can be racked vertically